Next:
Using SCHED for Project
Up:
THE SCHED USER MANUAL Version
Previous:
Keyin Input for Plotting
Contents
INFORMATION AND ADVICE ON SPECIFIC TOPICS
Subsections
Using SCHED for Project Planning
Scheduling Tips
Observing Strategy
Scan Times
Dynamic Scheduling
Management of Data Recordings
Recording Systems.
Recording Systems History and Background
Recording Systems Control
MARK5 and EVLBI
VLBA
MARK IV (PCFS)
NON-VLBA Telescopes with VLBA Recorders
Wide Band Observing: RDBE, DBBC, VLBA and Mark IV Modes
Spectral Line Observations
Reference Pointing
Multiple Phase Centers
Automatic Insertion of Geodetic Segments
Scheduling the VLA
VLBI at the VLA
VLA-Only Project Example
Parameters Specific to the VLA
VLA Standard Bands.
Special Concerns for Specific Observatories
Green Bank Telescope.
Single Dish VLBA Observing
Configuration Studies
Satellite Tracking
Craig Walker 2012-02-15